HALSTEAD 500566 DETECTION ELECTRODE LONG LEAD

Our Part No
1292314
MPN
500566

We're sorry but this product has now been discontinued by Halstead Heating Boiler Parts and can no longer be purchased.

No replacement part is available.

Sorry, this part is now obsolete

HALSTEAD 500566 DETECTION ELECTRODE LONG LEAD.

Product Information: The wiring inside a heating appliance connects the electronic control to the numerous thermostats, sensors and switches. These groups of wires allow the pcb to enact safety protocols and control the appliance.

This part is present in 3 different boilers in the Halstead range including the Halstead QUATTRO , QUATTRO GOLD , WICKES 2000 . In the next tab there is an appliance grid with links to all boilers that contain this part, Please use this if you would like to view all other spares that fit that model and download the user manual for that appliance. If none of these models match the appliance you have, please contact us before ordering so we can confirm this part is compatible.

We recommend that all parts are fitted by a fully qualified gas safe certified engineer. If you require any assistance finding a part, please feel free to contact us. Collectively we have over 200 years of boiler spares knowledge and distribution experience and our friendly call centre staff will be happy to help you with any query you may have


The HALSTEAD 500566 DETECTION ELECTRODE LONG LEAD is a genuine, brand new Halstead Heating Boiler Parts product, covered by a Halstead Heating Boiler Parts manufacturer's guarantee.

Not what you're looking for? Try our unique Spares Finder tool or you can view all Halstead Heating Boiler Parts products.

For advice on this or any product, please call us on 0330 123 3707, email us at web@dhsspares.co.uk, or see additional ways to contact us here.

This part fits the following 3 appliances (sorted alphabetically):

May fit others. If you are unsure of your product model, or would like more information, please contact us.

Recently Viewed Products...

VOKERA 20057866 PIPE

VOKERA 20057866 PIPE

Part No: 1533587 / MPN: 20057866

£106.80 inc VAT

In stock - Next day delivery available

CHNW 012/AY15 RIDDLER ROD

Part No: 2380958 / MPN: CH/012/AY15

£37.20 inc VAT

Available in 5-7 working days

FOCA F730065 VALVE V340NG

FOCA F730065 VALVE V340NG

Part No: 2551620 / MPN: F730065

£64.80 inc VAT

Available in 5-7 working days

VAILLANT 981111 PACKINGRING CPL.

VAILLANT 981111 PACKINGRING CPL.

Part No: 1374894 / MPN: 981111

£9.23 inc VAT

In stock - Next day delivery available